Domestic Waste Landfill

(3)
China Skid Mounted Container Disc Tubular 2 Stage DTRO Reverse Osmosis System for sale

Skid Mounted Container Disc Tubular 2 Stage DTRO Reverse Osmosis System

Price: $160,000.00 - $600,000.00/sets
MOQ: 1
Delivery Time: 5-8 weeks
Brand: QRZ
High Light:two stages dtro 50 ton / day, two stages dtro 50 ton / day Reverse Osmosis System, two stages dtro 50 ton / day RO System
QRZ-DTRO-J Skid-mounted Container Disc Tubular Reverse Osmosis System and Sewage TreatmentProduct DescriptionSpecificationitemvaluePlace of OriginChinaBrand NameQRZModel NumberQRZ-DTRO-30Product nameTwo Stage DTROModelQRZ-DTRO-JApplicationWater Treatment,sewage treatment, landfill leachate treatment... View More
➤ Visit Website
China Water Treatment NF Membrane System For Sewage Wastewater Landfill Leachate for sale

Water Treatment NF Membrane System For Sewage Wastewater Landfill Leachate

Price: $41,500.00 - $70,000.00/sets
MOQ: 1
Delivery Time: 5-8 weeks
Brand: QRZ
High Light:Water Treatment NF Membrane System, Wastewater Landfill Leachate Membrane System, NF Membrane System Sewage Landfill Leachate
Effective Water Treatment NF Membrane System for Sewage Wastewater Landfill Leachate Product Description Nanofiltration Nanofiltration (NF) is used to separate substances with relatively low molecular weight, such as inorganic salts or small organic molecules such as glucose and sucrose, from solven... View More
➤ Visit Website
China Proposal For Sewage Treatment Project of Domestic waste landfill Process Flow Diagram Unit Quotation And Operating Costs for sale

Proposal For Sewage Treatment Project of Domestic waste landfill Process Flow Diagram Unit Quotation And Operating Costs

Price: ¥1500-¥6000
MOQ: 1
Delivery Time: 3-5 working days
Brand: QRZ
High Light:Sewage Treatment Project Unit Quotation, Sewage Treatment Project Operating Costs, Sewage Treatment Project Introduction
Provide process technical support: 1. Include basic information, design scale, inlet water quality, discharge requirements, and other requirements. 2. Include preliminary process flow diagram and explanation. 3. Contains roughly the main equipment units and main equipment. 4. Provide a list of main ... View More
➤ Visit Website